Hotel.

The development is for 183 bedroom hotel adjacent to London city airport. The Metframe is 6 storey structure plus a 3 m tall parapet to the roof and a plant room on the roof

• The Ground floor of the structure was formed from a Hot rolled steel framed transfer structure.

• We used 160 Tonnes of Metsec 100 mm wide light gauge steel studs to form a gross floor area of 6400 m2.

• The Metframe structure has 3 lift shafts and two hot rolled steel welded pans stairs.

• The develop was very difficult logistically as the site boundaries abutted Highways and UK power network.

• Within 12 m of the site boundary are two Trunk roads, a live airport, Dock lands Light Railway (DLR) the construction of Cross rail and a very large electrical substation.

• The duration for the construction of the Metframe was 22 weeks – and completed on time.



 

CONTACT

(t) +44 (0) 29 2044 2060

(f) +44 (0) 29 2044 2065

(e) atkintrade@atkingroup.co.uk

ADDRESSES

Head Office
Atkin Trade Specialists Ltd
Viking Place
Roath Dock
CARDIFF
CF10 4TR

London Office
35 Parkmore Close
Woodford Green
ESSEX
IG8 0SJ

Accreditations